Know which production line will stop, before it stops.

SentinelChain watches earthquakes, export rules and filings, matches them to the parts in your SAP bill of materials, shows the revenue at risk per day, and drafts the purchase request for in-stock replacements.

Run the Taiwan earthquake scenarioSandbox data. No SAP connection needed.
Sample scenario: Stuttgart plant, Taiwan earthquake. Numbers come from demo plant data.
Sentinel UILive ERP Bridge
Search plant, part #, or disruption...
Daily Revenue at RiskSevere Shock
$1,041,687/day
Plant 1001 • Stuttgart Line 4
Mouser Qualified StockLock Ready
2,238 units
STM32F401RBT6TR • (Replaces STM32F401RE)
Line Buffer RemainingStoppage Warning
< 5 Days
Depletion Window: T+4.5 Days (Critical Buffer)

Inventory Depletion vs. Spot Inbound Delivery Window

Real-time simulation based on Plant 1001 burn rate

Day -7 (Normal Operation)Day 0: Seismic Shock RecordedDay +3: Air Freight InboundDay +7 (Buffer Restored)
HOW IT WORKS

From disruption alert to purchase request, in one flow.

Six steps connect a world event to your parts, your revenue and a replacement you can order.

1. Early warning

Live feeds from seismic networks, trade regulators and SEC filings, scanned continuously.

2. Part-level impact

We trace each event to the exact parts and finished products in your SAP bill of materials.

3. Revenue at risk

See the cost of the disruption in dollars per day, calculated precisely per manufacturing plant.

4. Replacement sourcing

We check live distributor stock for pin-compatible parts and rank them by availability, price and delivery time.

5. Spending guardrails

Quotes more than 10% above your SAP baseline, or alerts below 95% evidence confidence, never reach the approval step.

6. Audit-ready paperwork

Each purchase request comes with sources, part IDs and approved pricing in a one-page PDF.

Built on live public data and your SAP system.

Connected data sources and integrations. Today's demo runs on the SAP S/4HANA sandbox and live Mouser stock.

Integrations
SAP S/4HANA
SAP Ariba
Mouser Electronics
Groq Inference
Disruption Feeds & Public Data Sources
USGS Seismic Net
Federal Register (BIS)
SEC EDGAR
NY Fed GSCPI
Foundry IR (TSMC/ASML)

When a chip fab goes down, most teams find out from the news.

By the time procurement has traced the affected parts, called suppliers and chased approvals, the spare stock is gone. SentinelChain connects the event to your part, your plant and a replacement you can order.

Fab Incident M6.4
Critical
Affected ComponentSTM32F401RE
Plant ExposureStuttgart Line 4
Revenue at Risk$1,575,000 / day
Qualified drop-in3,384 in stock (Mouser)
Staged PR: PR-ARIB-2026-092Ready for approval
Sample scenario using demo data.
FREQUENTLY ASKED QUESTIONS

Clear answers to your technical questions

Everything you need to know about system architecture, safety guardrails, and data integrity.

No. The live demo is fully pre-loaded with an interactive sandbox replicating an automotive OEM's SAP S/4HANA bill of materials, including Stuttgart Plant 1001. You can test the end-to-end flow without entering any credentials or configuring SAP RFC connectors.
Never. SentinelChain strictly adheres to human-in-the-loop governance. It stages purchase requisitions (PR-ARIB-xxxx) with full audit telemetry and pricing validation in SAP Ariba or S/4HANA, leaving the final sign-off and PO release entirely in the hands of authorized procurement personnel.
We ingest directly from authoritative public and institutional feeds: USGS seismic event feeds, the Federal Register for Bureau of Industry and Security (BIS) export restriction rulings, SEC EDGAR 8-K / 10-Q filings, the New York Fed Global Supply Chain Pressure Index (GSCPI), and direct foundry investor statements (TSMC, ASML, STMicroelectronics).
Our multi-tier matching engine inspects manufacturer part number schemas, pin-out compatibility, thermal and voltage tolerances, AEC-Q100 automotive grade specifications, and real-time distributor inventory APIs (e.g. Mouser, DigiKey). Parts are ranked by availability, landed cost, and freight delivery lead-time.
SentinelChain uses deterministic guardrails: any AI-generated hypothesis must pass a multi-factor confidence threshold (≥ 95% evidence confidence). Quotes exceeding 10% variance against the SAP material master baseline are automatically flagged for manual review, preventing hallucinatory pricing or inappropriate parts.
Yes. In production, revenue at risk ($1,575,000 / day in our sample scenario) is calculated by traversing the SAP BOM tree down to individual planned production orders (PLAF) and finished product sales margins (CO-PA), accounting for plant-specific burn rate and safety buffer days.